Creating a Safe Work Method Statement Template

Creating a Safe Work Method Statement Template

Here is a video on how to create a new SWMS template. If you prefer to read this info, there is a step by step added below the video. 



1. Access the SWMS Module 0:02

  • Log into the portal.

  • Navigate to the SWMS module.

  • Locate the templates section.

 

2. Add a New Template 0:09

  • Click on 'Templates'.

  • Select 'Add New Template' from the top right.

 

3. Choose Template Type 0:26

  • Select 'New Template' to create a new Safe Work Method Statement (SWMS).

  • Reference existing SWMS if needed.

 

4. Fill in Job Description and Details 0:43

  • Enter the job description (e.g., excavation and trenching).

  • Add any relevant OH&S references and codes of practice.

 

5. Identify Responsible Personnel 1:25

  • Specify the person responsible for reviewing the SWMS.

 

6. List High-Risk Work Activities 1:37

  • Identify applicable high-risk work activities (e.g., risk of falls, excavation).

 

7. Add Job Steps 2:24

  • Click to add job steps.

  • Enter descriptions for each job step (e.g., inductions and training).

 

8. Assess Hazards and Controls 2:42

  • For each job step, identify hazards and control measures.

  • Use the risk matrix to evaluate risks associated with each hazard.

 

9. Document Control Measures 3:39

  • Specify control measures for each identified hazard.

  • Assign responsibility for implementing controls.

 

10. Complete Additional Job Steps 4:03

  • Continue adding job steps and associated hazards and controls as necessary.

 

11. Review and Submit Template 6:14

  • Review all entered details for accuracy.

  • Click 'Submit' to save the template.

 

12. Edit Existing Templates 8:01

  • To edit a template, click the pencil icon next to the template.

  • Add or modify job steps and hazards as needed.

 

13. Allocate Templates to Sites 8:17

  • Once completed, allocate the template to specific sites as needed.



    • Related Articles

    • Adding a SWMS from Sites

      The video explains how to create and manage Safe Work Method Statements (SWMS) within the Worx Safety system, either from the SWMS module or directly from a site. It shows how workers can clone templates, make them site-specific, and automatically ...
    • Contractor SWMS’s & Contractor Site-Specific SWMS Procedures

      In this video, I walk you through the process of onboarding contractors and managing their site-specific Safe Work Method Statements (SWMS) for high-risk work activities. We start by capturing relevant details during the contractor onboarding, ...
    • Modifying Safe Work Method Statements (SWMS) After Signing

      Overview Safe Work Method Statements (SWMS) are critical documents in workplace safety, particularly for high-risk construction work in Australia. This help article addresses common questions about modifying SWMS that have already been signed and ...
    • How to Download a Safe Work Method Statement from the App

      Here is a video on how to access your SWMS from the app. A step by step is below the video if you prefer to read through. <br> Step 1: Access Safe Work Method Statements (SWMS) 0:03 Open the app. Navigate to the site where your Safe Work Method ...
    • SWMS Updates: Site Assignment and Review Changes

      SOP: Assign, Review, Sign, and Close SWMS in the SWMS Module Objective This SOP explains how to assign a SWMS to a site, select who must sign it, review the job steps, collect signatures from workers on site, and close or archive the SWMS when the ...